- Installing 4TH Rings on Mega Columns
- Grouting of Mega Column Ring 4
- Poured 3 Sections of Concrete Wall along Leadership Institute
- Installing Wall Forms Along Admin/Workstation Wing
- Installing Rebar for Concrete Walls along Mechanical Room
- Installing Void Boxes and Waterproofing Membrane at Pour #5 – Rotunda
- Excavating and Fine Grading for Pour #6 – Rotunda
- Stripping Formwork for completed Pour #8



If you would like to view a time lapse picture of the site, please use the link below:
https://oxblue.com/pro/slideshow/nationalmedalofhonormuseum/mostrecent