 Weekly Progress Update #35:

  • Installing Structural Steel at the Theater.
  • Welding Off Mega Column Knuckle Columns.
  • Poured Dumpster Pad.
  • Installing Electrical Underground In Main Electrical Room Slab Pour 10B.
  • Closed Wall Forms For Wall Pour 14 / Ready For Concrete.
  • Wall Pour 13A Installing Wall Forms and Rebar Reinforcement.
  • Slab Pour 13A Installing Waterproofing and Void Boxes.

SERVICE BRANCH AFFILIATION FOR MEGA-COLUMN’S

We are often asked which mega-column is affiliated with each branch of the military.  The time to define and designate is now. 

For design, planning, and all future purposes, please refer to the following graphic identifying each mega-column’s service branch

affiliation.

Mega-Column Graphic identifying each service branch affiliation 
Mega-Column Graphic identifying each service branch affiliation 
Overhead Drone Photo of Site

If you would like to view a time lapse picture of the site, please use the link below:

https://oxblue.com/pro/slideshow/nationalmedalofhonormuseum/mostrecent