Weekly Progress Update #27:
• Completed slab pour #5 concrete.
• Slab Pour #6 installing void boxes, waterproofing membrane, and rebar reinforcement.
• Wall pour #5 was completed and setting forms for pour #6.
• Installed all mega column ring 7’s.
• Slab Pour #7, fine grading, excavating pile caps / floor recesses and installing void boxes.
• Preparing anchor bolts and embeds for structural steel delivery.




If you would like to view a time lapse picture of the site, please use the link below:
https://oxblue.com/pro/slideshow/nationalmedalofhonormuseum/mostrecent