Museum Construction Site Weekly Progress Update #49

Overview/Project Accomplishments:

  • Bolting and Welding lower Exhibit Hall structural steel.
  • Installing MEP hanger inserts over the café and loading dock roof areas.
  • Constructing the concrete airway walls at the mechanical rooms.
  • Pour concrete on the Theater roof deck.
  • Bolting up the 1st Star Beam for upper Exhibit Hall steel.

Institute and Theater

A current and future image of the Institute and Theater.  The Institute will serve as the epicenter of our global education and leadership programming, with the values enshrined in the Medal of Honor at the core of our mission.

The state-of-the-art Theater will be the performance centerpiece of the Museum and will host speaker programs, author talks, musical performances, events with Medal of Honor Recipients, and other attention-grabbing presentations.    

*The ‘Future’ Image (far right) does not reflect the final design of the Site Retaining Wall (Institute) and the Cladding (Theater). 

Institute and Theater

If you would like to view a time lapse picture of the site, please use the link below:

https://oxblue.com/pro/slideshow/nationalmedalofhonormuseum/mostrecent