Progress Update #38 – Overview/Project Accomplishments:

  • Installing rebar reinforcement for slab pour #10B.
  • Installing MEP risers inside of Mega-Columns.
  • Welding Knuckle Columns to top of Mega-Columns.
  • Installing metal decking on top of structural steel.
  • Installing site storm water lines.
  • Installed main electrical duct bank manhole.
Overhead Drone Photo of Site

UTILITY RISERS AKA ‘CANDY CANES’

The Utility Risers for all systems have been set in each mega-column.  The Utility Risers, AKA ‘Candy Canes,’ bundles various utilities from the Rotunda to the Exhibit Level within each mega-column.  The ‘Candy Canes’ were lowered by crane in through the tops of the mega-columns.  Shout out to Linbeck and The Brandt Companies!   

Utility Risers AKA ‘Candy Canes’ at the factory
Utility Risers AKA ‘Candy Canes’ being installed in the Mega-Columns

If you would like to view a time lapse picture of the site, please use the link below:

https://oxblue.com/pro/slideshow/nationalmedalofhonormuseum/mostrecent