Progress Update #38 – Overview/Project Accomplishments:
- Installing rebar reinforcement for slab pour #10B.
- Installing MEP risers inside of Mega-Columns.
- Welding Knuckle Columns to top of Mega-Columns.
- Installing metal decking on top of structural steel.
- Installing site storm water lines.
- Installed main electrical duct bank manhole.

UTILITY RISERS AKA ‘CANDY CANES’
The Utility Risers for all systems have been set in each mega-column. The Utility Risers, AKA ‘Candy Canes,’ bundles various utilities from the Rotunda to the Exhibit Level within each mega-column. The ‘Candy Canes’ were lowered by crane in through the tops of the mega-columns. Shout out to Linbeck and The Brandt Companies!